Home Uncapped Packages

SPEED UP TO
PRICE P/M
1 Meg – FREE for the first year with upfront installation of R 3500.
2 Meg
R 150
3 Meg
R 250
4 Meg
R 350
5 Meg
R 550
10 Meg
R 650
20 Meg
R 750
T&C Apply

NOTE: Download speeds on Home Uncapped Packages are shaped between 16:00pm - 24:00pm.

Premium Uncapped Packages

SPEED UP TO
PRICE P/M
4 Meg
R 450
6 Meg
R 650
10 Meg
R 850
12 Meg
R 1000
15 Meg
R 1100
20 Meg
R 1200
T&C Apply

Business Packages

SPEED UP TO (point to multi-point)
PRICE P/M (Ex. VAT)
10 Meg
R 3360
20 Meg
R 3750
50 Meg
R 4870
100 Meg
R 6280
T&C Apply
NOTE:
  • 60 Ghz link (not 5 Ghz) last mile on licensed spectrum.
  • Setup Cost R6500 (equipment belongs to service provider).
  • Subject to 24 month contract.
SPEED UP TO (point to point)
PRICE P/M (Ex. VAT)
20 Meg
R 10250
50 Meg
R 11000
100 Meg
R 12250
T&C Apply
NOTE:
  • The First Invoice will be billed after successful installation and must be paid within 5 days of invoice. Thereafter billing will be in advance payable 25 days after invoice. Payments must be made on time as failure to pay will result in suspension of links and then re-connection fees of R1000 per link will apply.
  • A charge of R1500 will be levied in the event that the Physical Line of Sight Survey is successful and the service is declined by the customer.
  • Please ensure that additional services are selected. A configuration fee off R500 will be levied if selected after install.
  • A call-out fee of R 1 500 will be billed if the designated person/s are not available and the survey team is refused entry to complete the task Installation and monthly pricing is dependent on a confirmed solution after the completion of the physical LOS (Line of Site) Survey, and the results have been received from Planning.
  • The Line of Site Survey also serves as confirmation of the cable route from the exterior of the building to a designated area inside the building.
  • An additional fee will be charged to cover costs such as Extended Fibre cabling (100 metres is part of the Standard Install Fee) and in the event a Cherry Picker is required because of Health & Safety Requirements. Quotes will be submitted for authorization before an install is scheduled.
  • Link sizes may not be downgraded during the term of the contract, Upgrading of Link sizes will be allowed without extending the term.